Pre-Bottle Rocket War Weekend
January 26 thru 27          
Form III was assembled to make sure it was ready to go.  We left it put together.  I hope Neil will not mistake it for the ATV and try to start it. If anyone sees Neil tell him "If it's green it's not the machine.".
The lake had enough snow cover to build forts (about 3 inches).
The Ice hole was started.  As I drilled into the lake I cann't help but remember how much the ice spud sucked!
Almost there.
Success!
The ice is about 9.5 inches thick.
Meg trudges back to measure the lake with respect to the nail.
The lake is still down about 11 inches from the nail.

Previous   Next